<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>OpenText Analytics Database 26.2.x – Creating a database design in Management Console</title>
    <link>/en/mc/db-management/creating-db-design-mc/</link>
    <description>Recent content in Creating a database design in Management Console on OpenText Analytics Database 26.2.x</description>
    <generator>Hugo -- gohugo.io</generator>
    
	  <atom:link href="/en/mc/db-management/creating-db-design-mc/index.xml" rel="self" type="application/rss+xml" />
    
    
      
        
      
    
    
    <item>
      <title>Mc: Using the wizard to create a design</title>
      <link>/en/mc/db-management/creating-db-design-mc/using-wizard-to-create-design/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      
      <guid>/en/mc/db-management/creating-db-design-mc/using-wizard-to-create-design/</guid>
      <description>
        
        
        &lt;p&gt;Take these steps to create a design using the Management Console&#39;s Wizard:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;
&lt;p&gt;On your database&#39;s dashboard, click the &lt;strong&gt;Design&lt;/strong&gt; tab at the bottom of the page to navigate to the Database Designer page.&lt;/p&gt;
&lt;p&gt;The left side of the Database Designer page lists the database designs you own, with the most recent design you worked on highlighted. That pane also lists the current status of the design. Details about the most recent design appear in the main pane.&lt;/p&gt;
&lt;p&gt;The main pane contains details about the selected design.&lt;/p&gt;
&lt;p&gt;&lt;img src=&#34;../../../../images/dbd-manual.png&#34; alt=&#34;&#34;&gt;&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To create a new design, click &lt;strong&gt;New Design&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Enter a name for your design, and click &lt;strong&gt;Wizard&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Navigate through the Wizard using the &lt;strong&gt;Back&lt;/strong&gt; and &lt;strong&gt;Next&lt;/strong&gt; buttons.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To build the design immediately after exiting the Wizard, on the &lt;strong&gt;Execution Options&lt;/strong&gt; window, select &lt;strong&gt;Auto-build&lt;/strong&gt;.&lt;/p&gt;

&lt;div class=&#34;admonition important&#34; role=&#34;alert&#34;&gt;
&lt;h4 class=&#34;admonition-head&#34;&gt;Important&lt;/h4&gt;
It is not recommended to auto-deploy the design from the Wizard. There might be a delay in adding the queries to the design, so if the design is deployed but the queries have not yet loaded, deployment might fail. If this happens, reset the design, check the &lt;strong&gt;Queries&lt;/strong&gt; tab to make sure the queries are loaded, and deploy the design.
&lt;/div&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;After you enter all the information, the Wizard displays a summary of your choices. Click &lt;strong&gt;Submit Design&lt;/strong&gt; to build your design.&lt;br /&gt;&lt;br /&gt;&lt;img src=&#34;../../../../images/wizard-complete-dragline.png&#34; alt=&#34;&#34;&gt;&lt;/p&gt;
&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id=&#34;see-also&#34;&gt;See also&lt;/h2&gt;
&lt;ul&gt;
&lt;li&gt;
&lt;a href=&#34;../../../../en/admin/configuring-db/creating-db-design/about-db-designer/#&#34;&gt;About Database Designer&lt;/a&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;a href=&#34;../../../../en/mc/db-management/creating-db-design-mc/creating-design-manually/#&#34;&gt;Creating a design manually&lt;/a&gt;
&lt;/li&gt;
&lt;/ul&gt;

      </description>
    </item>
    
    <item>
      <title>Mc: Creating a design manually</title>
      <link>/en/mc/db-management/creating-db-design-mc/creating-design-manually/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      
      <guid>/en/mc/db-management/creating-db-design-mc/creating-design-manually/</guid>
      <description>
        
        
        &lt;p&gt;To create a design using Management Console and specify the configuration, take these steps.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;
&lt;p&gt;On your database&#39;s dashboard, click the &lt;strong&gt;Design&lt;/strong&gt; tab at the bottom of the page to navigate to the Database Designer page.&lt;/p&gt;
&lt;p&gt;The left side of the Database Designer page lists the database designs you own, with the most recent design you worked on highlighted. That pane also lists the current status of the design. Details about the most recent design appear in the main pane.&lt;/p&gt;
&lt;p&gt;The main pane contains details about the selected design.&lt;/p&gt;
&lt;p&gt;&lt;img src=&#34;../../../../images/dbd-manual.png&#34; alt=&#34;&#34;&gt;&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To create a new design, click &lt;strong&gt;New Design&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Enter a name for your design and select &lt;strong&gt;Manual.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;The main &lt;strong&gt;Database Design&lt;/strong&gt; window opens, displaying the default design parameters. OpenText™ Analytics Database has created and saved a design with the name you specified, and assigned it the default parameters.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;On the &lt;strong&gt;General&lt;/strong&gt; window, modify the design type, optimization objectives, K-safety, Analyze Correlations Mode, and the setting that allows Database Designer to create unsegmented projections.&lt;/p&gt;
&lt;p&gt;If you choose &lt;strong&gt;Incremental&lt;/strong&gt;, the design automatically optimizes for the desired queries, and the K-safety defaults to the value of the cluster K-safety; you cannot change these values for an incremental design.&lt;/p&gt;
&lt;p&gt;Analyze Correlations Mode determines if Database Designer analyzes and considers column correlations when creating the design.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Click the &lt;strong&gt;Tables&lt;/strong&gt; tab. You must submit tables to your design.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To add tables of sample data to your design, click &lt;strong&gt;Add Tables&lt;/strong&gt;. A list of available tables appears; select the tables you want and click &lt;strong&gt;Save&lt;/strong&gt;. If you want to remove tables from your design, click the tables you want to remove, and click &lt;strong&gt;Remove Selected&lt;/strong&gt;.&lt;/p&gt;
&lt;p&gt;If a design table has been dropped from the database, a red circle with a white exclamation point appears next to the table name. Before you can build or deploy the design, you must remove any dropped tables from the design. To do this, select the dropped tables and and click &lt;strong&gt;Remove Selected&lt;/strong&gt;. You cannot build or deploy a design if any of the design tables have been dropped.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Click the &lt;strong&gt;Queries&lt;/strong&gt; tab. To add queries to your design, do one of the following:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;To add queries from the &lt;a href=&#34;../../../../en/sql-reference/system-tables/v-monitor-schema/query-requests/#&#34;&gt;QUERY_REQUESTS&lt;/a&gt; system table, click &lt;strong&gt;Query Repository&lt;/strong&gt;. In the Queries Repository dialog that appears, you can sort queries by most recent, most frequently executed, and longest running. Select the desired queries and click &lt;strong&gt;Save&lt;/strong&gt;. All valid queries that you selected appear in the &lt;strong&gt;Queries&lt;/strong&gt; window.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Database Designer checks the validity of the queries when you add the queries to the design and again when you build the design. If it finds invalid queries, it ignores them.&lt;/p&gt;
&lt;p&gt;If you have a large number of queries, it may take time to load them. Make sure that all the queries you want Database Designer to consider when creating the design are listed in the &lt;strong&gt;Queries&lt;/strong&gt; window.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Once you have specified all the parameters for your design, you should build the design. To do this, select your design and click &lt;strong&gt;Build Design&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Select &lt;strong&gt;Analyze Statistics&lt;/strong&gt; if you want Database Designer to analyze the statistics before building the design.&lt;/p&gt;
&lt;p&gt;For more information see &lt;a href=&#34;../../../../en/admin/configuring-db/creating-db-design/general-design-settings/#Statistics_Analysis&#34;&gt; Statistics Analysis&lt;/a&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;If you do not need to review the design before deploying it, select &lt;strong&gt;Deploy Immediately&lt;/strong&gt;. Otherwise, leave that option unselected.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Click &lt;strong&gt;Start&lt;/strong&gt;. On the left-hand pane, the status of your design displays as &lt;strong&gt;Building&lt;/strong&gt; until it is complete.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To follow the progress of a build, click &lt;strong&gt;Event History&lt;/strong&gt;. Status messages appear in this window and you can see the current phase of the build operation. The information in the Event History tab contains data from the&lt;a href=&#34;../../../../en/sql-reference/system-tables/v-monitor-schema/output-event-history/#&#34;&gt;OUTPUT_EVENT_HISTORY&lt;/a&gt; system table.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;When the build completes, the left-hand pane displays &lt;strong&gt;Built&lt;/strong&gt;. To view the deployment script, select your design and click &lt;strong&gt;Output&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;After you deploy the design using Management Console, the deployment script is deleted. To keep a permanent copy of the deployment script, copy and paste the SQL commands from the &lt;strong&gt;Output&lt;/strong&gt; window to a file.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Once you have reviewed your design and are ready to deploy it, select the design and click &lt;strong&gt;Deploy Design&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;To follow the progress of the deployment, click &lt;strong&gt;Event History&lt;/strong&gt;. Status messages appear in this window and you can see the current phase of the deployment operation.&lt;/p&gt;
&lt;p&gt;In the Event History window, while the design is running, you can do one of the following:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;
&lt;p&gt;Click the blue button next to the design name to refresh the event history listing.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Click &lt;strong&gt;Cancel Design Run&lt;/strong&gt; to cancel the design in progress.&lt;/p&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;Click &lt;strong&gt;Force Delete Design&lt;/strong&gt; to cancel and delete the design in progress.&lt;/p&gt;
&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;li&gt;
&lt;p&gt;When the deployment completes, the left-hand pane displays &lt;strong&gt;Deployment Completed&lt;/strong&gt;. To view the deployment script, select your design and click &lt;strong&gt;Output&lt;/strong&gt;.&lt;/p&gt;
&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Your database is now optimized according to the parameters you set.&lt;/p&gt;

      </description>
    </item>
    
  </channel>
</rss>
